Ten complete processes
There are five control processes and five early-start processes, interleaved in ABBA blocks and a final pair. Each performs two full-parameter alphabet-sort updates and saves a final checkpoint.
The paired rows label runs, not execution order; the ledger preserves the actual interleaving. Median reduction is 11.745%. Every early process is below every control in this sample.